October 24, 2026

What documents should go with a metal fabrication quote request?

Engineer marking up a printed shop drawing before sending a metal fabrication quote request

Key takeaway: A metal fabrication quote can only be compared if every shop received the same package: dimensioned drawings at the same revision level, quantities and annual volume, grade, general tolerance, finish, certificate type, delivery date and location. Before the total, read the offer's expiry date and the starting point of the lead time.

Two shops receive the same drawing of a stainless steel bracket for a metal fabrication quote. The first prices 304 with no certificate. The second prices 316L with a 3.1 certificate and polishing on the visible face. Both prices are fair, and they cannot be compared.

The drawing said "stainless" and nothing else. Each shop therefore filled the gap with its own assumption, and that assumption is what the buyer received in the form of a price.

A complete package gets every shop to price the same part

In short: seven pieces of information are enough for two shops to price exactly the same part.

The federal government imposes this discipline on its own buyers. Its guide on reviewing the statement of work, published by CanadaBuys in January 2026, calls for a document detailed enough that all bidders clearly understand the requirement and can submit competitive, compliant bids. The same guide requires a realistic, clearly described delivery schedule.

For a metal part, that level of clarity comes down to seven items:

  • Dimensioned drawings. A PDF for reading, plus the original 3D or 2D file. The file formats exchanged with the shop vary with the software, but the PDF and the file carry the same revision level.
  • Quantities. The order, the prototype if there is one, and the expected annual volume.
  • Grade and thickness. 304, 304L or 316L rather than "stainless", and a decimal thickness rather than a gauge.
  • Tolerances. Critical dimensions toleranced one by one, plus a general tolerance in the title block.
  • Finish. Polishing, passivation, anodizing or painting, with the visible face identified on the drawing.
  • Required documents. Material certificate, dimensional inspection report, welder qualifications.
  • Delivery date and location. An actual installation date, the address, and any dock or handling constraints.

Send this package, at the same revision level, to every shop you consult. Three prices built on three versions of the drawing only measure the gap between the versions.

A tolerance missing from the drawing shows up at assembly

In short: without a general tolerance in the title block, each shop applies its own, and a part can meet the drawing without fitting the assembly.

The ISO 2768-1 standard on general tolerances settles this case. It sets, across four classes, the permissible deviations for linear and angular dimensions that have no individual tolerance, and it explicitly covers sheet metal parts. Citing the standard and the class in the title block covers dozens of dimensions in one stroke.

The opposite excess costs money too. A tight tolerance on a dimension that touches nothing adds inspection, sometimes an extra process, and the estimator bills for it. The typical sheet metal tolerances provide benchmarks by process.

A test before sending: highlight each toleranced dimension and note, next to it, the neighbouring part it touches. A dimension with no neighbour can go back to the general tolerance.

The certificate type changes who is involved and the schedule

In short: a 3.1 certificate and a 3.2 certificate involve neither the same signatory nor the same lead time.

When a specification requires a material certificate, it often designates it by its type under EN 10204. According to the British Stainless Steel Association's article on EN 10204 certificates, the 2004 revision retains only four types: 2.1, 2.2, 3.1 and 3.2.

The 3.1 provides test results specific to the lot, signed by a manufacturer's representative independent of production. The 3.2 adds the signature of an independent inspector, appointed by the customer or by regulation. That visit has to be scheduled.

Write the required type in the request from the start, and specify whether traceability must follow each part down to the heat number. A 3.2 requested after the sheet has been purchased can force the shop to buy certified sheet all over again.

What the estimator assumes when the package is silent

In short: the price adds up material, time at each workstation, setups, finishing and inspection, then spreads fixed costs over the quantity.

The estimator first lists the operations and their sequence: cutting, bending, welding, finishing, inspection. Each one has a setup time, paid once per batch, and a time per part. Then come material, including the offcuts left by nesting parts on the sheet, and special purchases.

The statement of work template from Innovation, Science and Economic Development Canada gives the instruction in one line: "Leave no room for interpretation." Here is what the estimator interprets when six pieces of information are missing.

What is missingWhat the estimator assumesEffect on the quote
Specific gradeThe most common grade, or the safestPrices that cannot be compared
General toleranceThe shop's in-house valuesPart that meets the drawing, not the assembly
Annual volumeA one-time orderSetups charged to a single batch
Visible faceUniform finish everywhere, or nonePolishing left out or overbilled
Certificate typeNone, or the simplestLead time added after the order
Required dateThe shop's standard lead timeSchedule that does not match the job site

The annual volume line can be worked out by hand. In an illustrative example, one hour of press brake programming and setup adds six minutes to each part in a batch of 10, and 18 seconds to each part in a batch of 200. The bending time per part barely changes.

When two prices diverge sharply, ask each shop for its assumptions and exclusions, in writing. To start from the same assumptions at the outset, upload your drawings in PDF, DWG or STEP format with the free quote request.

Two lines of the offer are read before the total

In short: the offer's expiry date tells you how long the price holds, and the starting point of the lead time tells you when the part actually arrives.

A quote is a snapshot of the day's prices. According to the September 2026 industrial product price indexes, published by Statistics Canada on October 22, 2026, unwrought aluminum and aluminum alloys cost 26.9% more than a year earlier, and copper and copper alloys 46.3% more. The agency notes that this index excludes customs tariffs: the price a shop pays for its sheet can move more.

Hence the first line: the expiry date, and the clause stating whether the material price is fixed or indexed. An offer accepted after its expiry date is often repriced, and rarely downward when metal prices are rising.

The second line is the starting point of the lead time. "From receipt of purchase order" and "from drawing approval" do not give the same delivery date. In the second case, the shop produces the shop drawings and waits for your sign-off, and every week of internal review is added to the schedule. The steps of a custom project show where this moment fits in the overall process.

Then come procurement, the production queue, finishing and shipping. A common grade often comes out of a distributor's inventory, while a duplex, a very large sheet or a 3.2 certificate may require a special order. Ask whether finishing and shipping are included in the promised date.

A metal fabrication quote comes down to one line on the drawing

The bracket from the opening would have received two comparable prices with one more line on the drawing: "316L, EN 10204 3.1 certificate, polish face A." The whole package works this way. Every piece of information written down removes an assumption from the estimator, and every assumption removed brings the prices closer together.

So reread the request the way a shop that knows neither the project nor the job site would. If a dimension, a grade or a date forces it to guess, fill it in, then send the complete package with the target installation date.

FAQ

Can you request a metal fabrication quote without drawings?

Yes, but the price remains a budget price. A dimensioned sketch, photos or an existing part to reproduce give an order of magnitude. The firm price of a metal fabrication quote comes after the shop drawings are produced, once every dimension, weld and finish is set. If the shop models the part from a concept, that work is added to the total. The document should state whether it is a budget or a firm price.

How can you estimate a metal project before requesting a quote?

By counting the operations for each part: cuts, bends, weld beads, surface to polish. This count shows the heaviest cost items and the details a design tweak would simplify, such as two welded parts that a bend could combine. It does not give a price: the estimator knows their setup times, material offcuts and the day's sheet price. Keep it to prepare your questions for the shop.

Why are two quotes for the same part so different?

Rarely because of the hourly rate. Most often, the two shops did not price the same thing: a different grade, a forgotten finish, a certificate included or not, a quantity read as a one-time order. Exclusions at the bottom of the page, such as shipping, packaging or installation, also widen the gap. Each shop's written list of assumptions and exclusions makes it possible to compare the offers line by line.

François Sauvé
François Sauvé Owner and entrepreneur

With nearly a decade of ownership experience, he is a driven entrepreneur known for his relentless work ethic and commitment to excellence. As the owner of various manufacturing businesses, he places a strong emphasis on customer relations, building lasting partnerships through reliability, precision, and high-quality stainless steel and aluminum fabrication.